
Overview
This post walks through the features Microsoft has published for Business Central 2026 Release Wave 2, based on the update 29.0 public preview. You will also find what the retirement of Release Plans means for how you track future updates.
Key Takeaways
- Microsoft opened the public preview for update 29.0 in the first week of September 2026, with general availability expected in the first week of October.
- The preview applies to sandbox environments only. Production and on-premises environments do not get these features yet.
- Expense Agent gains the most ground this wave, picking up approvals, interim approvers, travel requisitions and better duplicate detection.
- Subcontracting, quality inspections and warehouse handling all improve, which matters if you run manufacturing or distribution.
- Reporting gets a substantial rebuild through composable layouts, report themes and an updated Word add-in.
- Microsoft stops publishing Release Plans from September 2026 and moves disclosure to the AI at Work roadmap.
What the Update 29.0 Preview Actually Covers
Microsoft published the update 29.0 preview details on 3 September 2026. The preview runs from the first week of September until general availability in the first week of October 2026.
Only sandbox environments can run it. You can either create a fresh sandbox on version 29.0 preview or update an existing sandbox, which lets you test the release against your own data and extensions.
Microsoft deletes preview sandboxes 30 days after general availability, so expect them to disappear in early November. Preview features carry restricted functionality and supplemental terms, which means you should not rely on them for live processes.
Our team at Tecvia tracks each wave as it moves from preview to release. If you want a sandbox set up for testing, our implementation team can arrange it.
Release Plans Are Retiring: What Changes for You
From September 2026, Microsoft stops publishing Release Plans for Dynamics 365 and Power Platform. New Business Central capabilities now appear on the AI at Work roadmap instead.
Existing release plans stay online for historical reference. Features in update 29.0 no longer link back to a release plan entry, which is why some items below have detail pages and others do not.
This changes how you plan ahead, because there is no longer a single six-monthly document to work from. We covered the practical impact in our post on Business Central release plans retiring.
Copilot and Agents
Microsoft continues to build out agents rather than chat features. Payables Agent gets sharper matching, and the MCP Server picks up query capability.
|
Feature |
What It Does |
|
Matches on line amounts and expected receipt dates, and aligns draft finalisation with Receipt on Invoice settings |
|
|
Run data queries with MCP Server |
New MCP tools let you define, validate and run custom data queries where no API exists |
Expense Agent
Expense Agent arrived in Wave 1 and matures quickly here. Six changes land in this preview, most of them aimed at approval and compliance gaps.
|
Feature |
What It Does |
|
Reviews submitted reports with AI policy validation that flags noncompliant lines |
|
|
Routes submissions through a temporary reviewer before final approval |
|
|
Plans and approves travel in advance, with support for multiple travellers |
|
|
Sets mileage rates by effective date range and vehicle type |
|
|
Detects duplicates against already posted documents |
|
|
Works out employee withholding tax inside the report |
E-Commerce and the Shopify Connector
Shopify B2B is the headline here. If you sell to trade customers as well as consumers, this wave closes a real gap.
|
Feature |
What It Does |
|
Maps company tax identifiers, manages B2B catalogues and controls price sync |
|
|
Moves to Shopify’s July 2026 API, adds secure access tokens and clearer diagnostics |
|
|
Control sales document creation for Shopify orders and returns |
Lets you use the Shopify order number and review contacts before creating documents |
|
Suggests tax jurisdictions with confidence levels and rate differences for review |
|
|
Includes HS codes and country of origin in product sync |
|
|
Process Shopify order changes, exchanges and refunds |
Keeps edited and exchanged orders aligned when you create sales documents |
Anyone running the connector should note the API change. Shopify supports each API version for 12 months, so staying current is not optional. Our Shopify partner page covers how we handle these upgrades.
Financial Management and Electronic Documents
Withholding tax moves into the standard product, having been a localisation feature previously. Excise duty handling also broadens.
|
Feature |
What It Does |
|
Brings vendor withholding tax into the standard version |
|
|
Calculates and posts withholding tax on employee payments |
|
|
Supports several excise duties on one item |
|
|
Adds compliant accelerated depreciation calculation and reporting |
|
|
Set up vendor specific number series for self-billing invoices |
Meets supplier requirements and improves invoice traceability |
|
Sends and receives orders and payments using the Peppol BIS 3 EDI standard |
EDI through E-Documents deserves attention. Peppol already underpins the direction of travel for UK finance teams, which we set out in our post on the 2029 e-invoicing mandate.
Supply Chain Management
Subcontracting dominates this section. Microsoft moved subcontracting into a dedicated app during Wave 1, so this release fills in the practical gaps.
|
Feature |
What It Does |
|
Adds assisted setup, notifications for missing setup and Contoso demo data |
|
|
Lets basic warehouse setups handle subcontracting alongside normal inbound and outbound work |
|
|
Passes routing comments and attachments through to the subcontractor |
|
|
Migrate Italian legacy subcontracting data to the Subcontracting app |
Moves setup, prices, and document references, with sandbox verification first |
|
Fills in passed and failed quantities automatically and links posting errors to the blocking inspection |
|
|
Post direct transfer orders from warehouse-enabled locations |
Supports direct transfers from locations needing picks or shipments |
|
Work more efficiently with manufacturing documents and capacity calendars |
Creates released orders from the Planning Worksheet and makes capacity calendars easier to maintain |
Quality management continues to build on the extension introduced in Wave 1. Manufacturers running batch or lot processes should test this early. Our manufacturing and engineering page explains how we approach these configurations.
Reporting and Data Analysis
This is the largest single section of the release, with 14 changes. Composable layouts sit at the centre of it.
Report themes let administrators set a consistent look for PDF output. You can apply defaults globally, per company, per report or per layout. Header and footer layouts become reusable across document reports, which removes a lot of duplicated design work.
The Word add-in gets new design components, conditional visibility through a HideIf control, and controls for building themes and headers. Financial reporting also improves because you can define report packs. You can run several reports into a single PDF. You can trace how a general ledger account feeds a calculation.
Two smaller changes matter for audit. Financial report definition changes now log automatically, and system audit fields become available in analysis mode and in profiles. If you already use Power BI with Business Central, the new report inbox APIs open up further automation through Power Automate or MCP.
User Experiences, Governance and Platform
Everyday usability picks up several practical wins. A new review bar shows documents where agents need human input, and Tell Me remembers recent searches. Lookups now suggest your most recently used records, and you can preview images without leaving Business Central.
On the administration side, you can turn SIFT indexes on and off in the application. Open in Excel actions now log to telemetry, which helps with compliance and security investigations.
The platform change worth flagging is the new data model for table extensions. All fields on an AL table now sit in the same database table, so database operations involving extensions run faster.
Sustainability Management
Sustainability continues to mature into something UK businesses can report from. Seven changes land here, including EUDR certification information, carbon footprint tracking for fixed assets and estimated footprints on service invoices.
You can also calculate emissions in purchase documents using formula-based inputs, track carbon in item and reclassification journals, and reverse sustainability ledger entries directly. Businesses in food and beverage or distribution facing customer ESG questions should look closely at the EUDR and item tracking changes.
Development
Microsoft lists more than 20 developer changes, so this section is deep. Highlights include running AL tests from command-line and CI/CD workflows, AI agents that profile slow sessions or debug recorded failures, and indexes that span base tables and table extensions.
Interfaces gain default implementations, tables warn you when they approach SQL column limits, and integer fields can migrate to BigInteger with compiler warnings. Full details sit on Microsoft Learn if your developers or partner need them.
Our Thoughts on Business Central 2026 Wave 2
Wave 1 gave you agents. Wave 2 makes them usable in a real approval chain, which is the harder problem.
Expense Agent is the clearest example. An agent that captures receipts is useful, but an agent that routes reports through interim approvers and flags policy breaches replaces an actual process. Travel requisitions push it further still.
Subcontracting is our second pick. Basic warehouse support means smaller manufacturers can finally use it without moving to advanced warehousing, and carrying routing instructions into purchase orders removes a common source of error.
The reporting work is quietly significant. Report themes and reusable headers cut the cost of branded documents, which has been a persistent expense for customers with heavily customised layouts.
We would also flag the Release Plans retirement as the change with the longest tail. Tracking what is coming now takes more effort, not less, and you will want a partner watching the roadmap on your behalf.
What This Means for Your Business
Every business runs Business Central differently. Some of these features will apply the moment they arrive. Others need configuration, testing or a licence review before they deliver anything.
The preview window is short, so the sensible move is to spin up a sandbox now and test the changes that touch your processes. General availability follows in October, and updates then roll out inside the window your administrator sets.
At Tecvia, we work with businesses across manufacturing, distribution, food and beverage, life sciences and medical devices. We can identify which Wave 2 changes matter for your setup and check that your extensions still behave. Take a look at our full Business Central features overview, then speak to the team and we will walk you through what is changing.
FAQs
For anything not covered here, get in touch directly. We’re happy to answer questions specific to your business and your ERP requirements.
The public preview opened in the first week of September 2026. General availability follows in the first week of October 2026. Further features and on-premises information arrive when version 29.0 becomes generally available.
It is version 29.0, often shortened to BC29. The public preview build is W1 29.0, covering Platform 29.0 and Application 29.0.
No. The preview applies only to online sandbox environments, not to production or on-premises. Microsoft deletes preview sandboxes 30 days after general availability, so plan for early November. Preview features are not meant for production use and may have restricted functionality.
If you run Business Central online, your tenant updates automatically inside the update window your administrator sets in the admin centre. Testing in a sandbox first is still worth the effort, particularly if you use extensions or customised report layouts.
Microsoft stopped publishing Release Plans in September 2026. New Business Central capabilities now appear on the AI at Work roadmap instead. Older release plans stay online for reference, but features in update 29.0 no longer link to them.
Subcontracting is the standout, because basic warehouse configurations now support put-aways and picks. Quality inspections also need less manual entry, and routing instructions carry through to subcontractor purchase orders. Capacity calendar handling and released orders from the Planning Worksheet round it out.


